+38 067 688 21 88daily 08:00–20:00
Message on Telegram

Open your wake park from scratch

Reversible cable systems for wakeboarding and water skiing — from idea to launch.

Since 201350+ systems installed3-year warranty

Model PRO

A reversible cable system for daily commercial use, competitions and training. Daily ride report on the display.

Tower height
11 m
Power
7.5 kW
Distance
100–200 m
Drive
toothed belt drive
Reliability
extra safety cable
Warranty
3 years
$17,000≈ UAH 731,000 at the current rate · manufacturing and supervised installation, launch and handover
What's includedGet a free quote
Model PRO

Cable system layout

Cable system layout

Completed projects

Tap a photo to open the gallery.

Blue Lake Wake Park

Kamianske
Our first wake park

First-generation system · 208 m · 2013

Вейк-парк «On the Water»

Poltava

Model PRO · depth 5 m, length 130 m · 2026

Seven Bay Wake Park

Kyiv
Towers set in 14 m of water

2 × Model PRO · 24 m towers · 2024

Kozatska Sloboda resort

Volia Yakubova, Lviv region

Model PRO · 170 m · 2023

Adrenaline Wake Park

Zaporizhzhia

2 × Model PRO · 200 and 190 m · 2015, 2023

Wild West Wake Park

Biryuchyi Island

Model PRO · 170 m · 2020

Where our systems operate

Tap a dot to see what we did in that city.

our cable systemsupgrades, other manufacturers’ equipment

Some parks run 2–3 systems.

All our projects

We welcome references: you can contact park owners and ask what it is like to work with us.

2026Poltava, Kyiv

Poltava · On the Water — reinforced PRO

A non-standard project with higher strength requirements. Installation on the lake bed at 5 m depth using a reinforced 16 m tower.

Kyiv · X-Park — Rail 2 Rail

Another large project in feature manufacturing. We built a 20 m Rail 2 Rail weighing about two tonnes. A big, technically complex structure made for a modern wake park.

2025Kryvyi Rih, Chernivtsi, Kyiv, Blue Lake

A record year! There were so many projects that we ourselves wondered how we managed them all.

Kryvyi Rih · Avangard — PRO

A PRO cable system installed in just two days.

Chernivtsi · Aquawake — 2 × PRO

Two PRO cable systems at once for a new wake park.

Kyiv · X-Park, Central Park of Ukraine — Transition Rail

Fabrication and installation of a massive all-welded plastic Transition Rail weighing about two tonnes.

Kryvyi Rih · Solnechnaya — installation

Installation and launch of a third-party cable system.

Blue Lake — new PRO

A return to where it all began! We installed a new PRO to replace our first cable system, built in 2013.

Kyiv · WakeHub — 2 cable systems

Installation of two third-party cable systems. Another proof that we can work with equipment from different manufacturers and find solutions in difficult situations.

Besides the large projects, over the year we also built and installed many smaller features for various wake parks.

2024Kyiv

Kyiv · Seven Bay — 3 cable systems

A real leap in complex engineering projects. We installed three cable systems on the bed of a lake 14 m deep: two of our own make and one from another manufacturer, which we improved and made ready for use. Seven Bay is where a new chapter began for us: building features for wake parks. We made a full set for the circular cable: two 18 m fun boxes, a two-level ollie kicker, a slider and other features.

2023Lviv, Volia Yakubova, Irpin, Zaporizhzhia

Lviv · Voodoo — upgrade

We upgraded a cable system from another manufacturer by installing our software and control panel. We help launch and improve equipment regardless of where it comes from.

Volia Yakubova · Kozatska Sloboda — PRO 170 m and a tow lift

We installed a modern PRO cable system and a tow lift for tubing that works all year round. We are widening our range and learning new kinds of cable systems.

Irpin · Kachka — PRO

After working with equipment from several manufacturers the customer came back to us. We completed a second order and installed a PRO cable system.

Zaporizhzhia · Adrenalin — PRO

Eight years later the park owners chose us again! This time the project was especially large: installation at a depth of three metres with 18 m towers set directly on the bed. New engineering challenges that we handled successfully.

2022Moldova, Rivne

Moldova · MD — PRO

After working with different manufacturers the customer chose our company for a second cable system. For us it is one more confirmation of the quality of our equipment and the trust in our work.

Rivne — electrics and software

The customer mailed us their control cabinet. We installed our own controller, control panel and software. The cabinet then went back, the customer did the installation themselves, and the system worked flawlessly.

2021Lyman, Koblevo

Lyman · Ibiza — PRO

Installation in winter at −10 °C. The first run took place right on the ice. An unusual experience that proved once more that for us the installation season does not end with summer.

Koblevo — 2 × PRO

Two full projects with a non-standard way of placing the equipment: directly on the bed of the estuary.

2020Biryuchy Island, Serhiivka

Biryuchy Island · Wild West — PRO

A special story for us. Back in 2010 we dreamed of building our own wake park and looked for ways to do it. It took ten years to gather the experience and make it happen. That is how our second own location appeared.

Serhiivka — repair and upgrade

A customer’s trust is the best rating of our work. After a successful first job the park owners came back to us to repair and upgrade another third-party cable system.

2019Kharkiv, Serhiivka, Cherkasy

Kharkiv · Kvituchyi — third PRO

Five years after our first cooperation the park owners came back to us. The third PRO cable system confirmed their trust in our work.

Serhiivka — upgrade

We do not only produce our own equipment, we also help improve systems from other manufacturers. At this site we carried out repairs and installed our electrical system and power drive.

Cherkasy · Union — 2 × PRO

Two upgraded PRO cable systems. The equipment has stood the test of time: the systems have run for several years without breakdowns and still delight athletes.

2018Kinburn Spit, Kyiv, Kherson, Ukrainka

Kinburn Spit — PRO

Another point on the map of our projects. An unusual location and new experience installing equipment on the coast.

Kyiv · Stav 14 — Light

Our first experience with the Light model. The project turned out to be difficult and needed extra warranty work. We brought the system to working order and the customer was happy with the result.

Kherson · Black Otter — PRO and Light

Two cable systems for different rider levels. A complex installation that we completed quickly. We also remember the pleasant cooperation with the customer, Yevhen.

Ukrainka · Wickston — electrics and drive

A cable system for real giants! The customer built a huge structure, 13 m high and 300 m long, on their own. Our task was to design and install the electrical part and the drive. We spared the team long experiments, and our electronics still work reliably today.

2017Mykolaiv

Mykolaiv · Sunset — PRO

An installation with local ground to deal with: the tower piles had to be screwed into a dense layer of shell rock. We managed it and launched the site.

2016Horishni Plavni

Horishni Plavni · Zhara — PRO

A new city for us, and an introduction to wakeboarding for its residents. One more finished project in our portfolio.

2015Zaporizhzhia, Hadiach

Zaporizhzhia · Adrenalin — PRO

Our project in the south of Ukraine. The new cable system gave local riders more room to ride.

Hadiach · Sunset — first winter installation

This site is remembered for unusual installation conditions. It is where we first installed a cable system in winter, working right on the ice.

2014Kharkiv

Kharkiv · Kvituchyi — 2 × PRO

Two new projects in Kharkiv. We widened the geography of our installations, refined the design and gained the experience that became the basis of later developments.

2013Kamianske

Kamianske · Blue Lake — our first cable

This is where our story in wakeboarding began: the first project, the first experience and the start of a long road that continues today.

Why clients trust us

3-year warranty

Our systems run 3 to 6 years without specialist intervention — that is why we can warrant them.

No surprises in the price

The final cost for a full launch, with no hidden payments.

Documents included

Technical passport, legal opinions, technical specifications, sanitary and fire-safety papers.

Steel built to last

Hot-dip galvanizing protects against corrosion for 50 years. No painting needed.

From request to launch

  1. Request and consultation
  2. Site assessment
  3. Quote and contract
  4. Production~1.5 months
  5. Installation4 days, complex install up to 2 weeks
  6. Launchpart of installation

From contract to first ride — about 2 months. Order in winter and everything is ready for the season. Start with step 1

Obstacles for your park

Kicker

Kicker

370 kg · 4 × 2 × 1 m

Olli kicker

Olli kicker

650 kg · 8 × 2 × 1.3 m

Slider

Slider

500 kg · 14 × 0.5 × 0.5 m

Built in our own workshop in Dnipro. Custom ones from your sketch: rail-to-rail, funboxes, rooftops; we have made pieces up to 3 tonnes.

Discuss your obstacle

Estimate your season

Enter your own assumptions. This is not an income promise: results depend on location, demand, weather and operations.

Example for an average wake park — change it to match yours

Season revenue—
Profit before tax—
Payback, seasons—
Get a quote for my location

Videos

Useful tips

Installing cable systems

More from our workshop

Custom projects we built and launched to order.

Surface tow lift for tubing

120 m · year-round · Volia Yakubova, Lviv region

Obstacles and ramps

Made from plastic in our own workshop

Towers, carriages, reels

Our own production in Dnipro

Geodesic domes

Frame and cover from our workshop

Need something custom? Let’s discuss

FAQ

What's included in the price?

Manufacturing of the system (2 galvanized towers, electric drive, cables, moving and fixed carriages, control cabinet, remote, control software, 7 screw anchors) and supervised installation: our specialist plus 2–4 helpers from your side. Not included: delivery from our warehouse to the site, a motorboat during installation, permits, travel and accommodation for our two specialists.

What kind of water body do I need?

Water width from 20 m, depth from 1.2 m, riding length 100–200 m (120–170 m is the sweet spot), riding zone up to 15 m wide, 10–15 m on each shore for guy wires. Calm water is ideal; we assess every lake individually. We have built on open water, on an estuary, and with towers set on the lake bed at depths of up to 14 m.

What power is required?

One system needs 380 V, 3-phase, 7.5 kW (16 A). If you use a generator, it should be at least 11 kW.

How long until launch?

Manufacturing takes about 1.5 months. Installation takes 4 days in normal conditions and up to 2 weeks in complex ones (for example, towers on the lake bed). It is best to order in winter and be ready for the season without rush.

How does payment work?

We work under a contract, any form of payment. 70% advance (can be split into three payments during production), 20% when the equipment is ready to ship, 10% after installation, launch and handover. The price is US$17,000 at the current rate. Towers on the lake bed: terms and price agreed separately. Sole proprietor, no VAT.

Who services it, and what about spare parts?

3-year warranty with proper use; spare parts are made by us in Dnipro. We either come to you or help remotely, as you prefer. A site visit covers travel, accommodation and the work itself, usually replacing rollers and greasing bearings.

Do you train staff?

Yes. We train operators on your site or at our location. We also have videos for new operators: how to ride people, how to start the day and how to look after the system.

Do you work outside Ukraine?

Yes, we have export experience. The price is converted at the current rate.

Didn't find your answer? Message us on Telegram

Contact us any way you like

+38 067 688 21 88

Dnipro, Ukraine · daily 08:00–20:00

Follow us

Fresh news from our parks and workshop.

Or leave a request — we will call you